Home

  
 
 

Search Knowledge Base


Knowledge Base Web View
Total Records: 103
ID Title Type Of Article
487 
Access Denied on Scorpion Interactive Web Portal Support
474 
Windows Startup Folder Location Support
557 
DT Easy Button working with Remote Desktop or Parallels Support
517 
500 colours by colour name, Hex value, RGB value and Microsoft Access code number Support
490 
Excel Opens File Very Slowly in Remote Desktop Session RDS Support
404 
Adding Media Players to Engage PHD Cloud Manager Support
403 
Android Player Setup for Ping HD Signage Program Engage PHD Support
258 
SOPHOS XG Licensing Guide Support
257 
Windows 10 1803 Redstone 4 Upgrade Support
687 
Fix for Error Call to GetCustomUI() for RibbonID "Microsoft.Excel.Workbook in Engage OLE" Support
712 
Windows 10 multiple display - windows are moved and resized on display power cycle or sleep Support
1037 
Engage Startup Settings will Crash if not setup correctly Support
1065 
Email DMARC stands for Domain-based Message Authentication, Reporting and Conformance Support
1374 
Engage Corrupt Application Run Directory SCVersion10 Error Missing Variable Input Support
1457 
Firewall Lost Connection between network or internet Support
1228 
Customer Care Vendor Management & Billing Protocol SOP
1312 
Case Studies and Success Stories Sales Collateral
1323 
Sophos MDR Managed Detection and Response Sales Collateral
993 
5 things customers want from their salesperson Sales and Marketing
273 
Offboarding Checklist New Client
222 
Onboarding VMS check List New Client
101 
RETRIEVE AN ONT OR MODULE INVENTORY REPORT IN AXSVISION How To
116 
Install & Configure Sonicwall NSA 220 Lan Analyzer Software How To
319 
Submit a Ticket on Scorpion Interactive - Client Facing How To
312 
Conference Call Setup with 3CX Windows Client How To
Add New  Records per page  2 of 5   
Engage Knowledge Base Web View         Case Study          Print
Title Seminole Hard Rock Casino – PCI Compliance for 5 years of data backup on tape      
Resolution
Case Study: Seminole Hard Rock Casino - PCI Compliance for 5 years of data backup on tape
               
Jeff Odenheimer Sr. Network Administrator at Seminole Hard Rock Hotel & Casino
 "We had a complicated compliance issue at Hard Rock. Data-Tech's engineers came up with a unique solution and helped us achieve PCI Compliance for our Data."
 
Seminole Hard Rock Hotel & Casino had a unique challenge.  They had 5 years of LTO tape backups that needed to be encrypted. Jeff Odenheimer received  our name from a shared vendor for long term file storage. We had been doing business with this vendor and their clients for several years.
 
Jeff gave us call because he was told we focus on IT Solutions not just IT Products. Jeff said we were described as a company that likes challenges and creating unique cost effective solutions.  
 
Hard Rock had the need to encrypt 5 years of LTO Tape Backups for PCI compliance but also had a small budget in which the project needed to be completed.  Data-Tech's CEO and R&D Engineer Chris Lietz took the challenge to the senior engineering team at Data-Tech.  Within a day the team came up with an elegant solution that would fit the Hard Rock project budget.
 
The team realized the challenge was to encrypt the tapes and keep the data structure of the tapes intact.  This was the only way to ensure if Hard Rock needed to retrieve any data it would be where it was originally stored.  The other solutions Hard Rock had received did not take this into account and Hard Rock was relieved and impressed that our engineering team was able to realize this.
 
So the challenge wasn't really the encryption, it was preserving the original data structure after encryption. Our solution was simple. Analyze the tape structure for Server and Resource names, Create a Virtual Environment to replicate the original servers, restore the data to its original locations, then backup the data again this time using Encryption.  
 
Because the backups were up to 5 years old, many of the servers and data locations were gone or changed on the Hard Rock network. So this was the only way to preserve the data structure and integrity.  
 
Data-Tech created a special Virtual Server Farm and was able to recreate the server structure for each data backup.  Hard Rock had 5 locations with data and PCI compliance needed to be achieved in only a few months. Within the Virtual Server Farm Data-Tech was able to have several Data Restore and Backup jobs running simultaneously.  
 
Though the project took a little longer than estimated due to LTO Tape Speed limitations, the project was completed and the Seminole Hard Rock Hotel & Casino passed the PCI compliance Audit.
 
 
 
Vendor *
Web Link
Date Entered 4/3/2019
You Tube Link
Type Of Article Case Study
Article ID 585


  Copyright    Lietz Development, Inc. 1996. All Rights Reserved.